Construction of approx. 5 km of paved pathway. 13,400m2 of stripping and stockpiling of topsoil onsite; 6500m2 of clearing and grubbing; 4800m3 of cut and fill with native and imported material; fence removal and new installation; sign removal and reinstallation, culvert extensions and new installations, and high tension cable barrier installation along Trans-Canada highway Right-of-Way; 10700m2 of asphalt pathway installation including subgrade preparation, pathway substructure installation, and 100mm Mix B asphalt overlay; Concrete sidewalk and concrete moonwalk installation 100m length; installation of pathway signage and pathway pavement marking; installation of pedestrian crossing signals complete with thermoplastic crosswalk markings and signage; hydro seed 7300m2 of disturbed construction area; an additional 2700m2 of 50mm Mix B asphalt overlay with base re-compaction; traffic accommodation strategy preparation and compliance; erosion and sediment control compliance.
Construction and re-establishment of the trail network, campground, trailer park road structure, electrical, water and sewer system including complete reclamation / remediation of the site.
onstruction of approx. 1 km of gravel surfaced walking trails at the Medicine River Wildlife Centre.
2015)Removal of existing 6.1m single span, type PA concrete girder bridge with timber substructure; construction of 3.0m diameter culvert and associated work; environmental management; and roadway construction within work limits on Township Road 355A.